1.5M tons handled in March! – Magdragon II Picks Up The Pace.

Magdragon II is a floating transfer station – operating close to Cape Preston in the Pilbara Region of West-Australia – with two 3000B series E-Cranes designed to unload magnetite from ocean going barges into hoppers, which feed a conveyor system and ship loader. The transfer station mainly loads Mini Cape vessels destined for China. Magdragon II handled close to 1.5 million tons of magnetite iron ore in March 2020. E-Crane would like to congratulate all at Citic Pacific Mining with this record throughout, especially considering the challenging working conditions during this Covid-19 pandemic.

A capture of the E-CARE (E-Crane Analysis & Reporting) data for one of the E-Cranes on board Magdragon II for March 2020

Read more:

Installation completed of the two 3000 Series for Loreto Maritime
Dry commissioning of the second transhipper for Loreto in full swing

SUBSCRIBE TO OUR NEWSLETTER

Newsletter signup

Follow us

E‑Crane Worldwide

Koekoeklaan 53
9991 Adegem
Belgium

Contact us

T +32 9 378 04 44

info@e-crane.com

Bureau of International Recycling
The Institute of Scrap Recycling Industries, Inc. (ISRI)