Cutting unloading time… reducing costs.

“The E-Crane system has cut our unloading time in half, cut our maintenance time dramatically, simplified operation and reduced our costs.”

Mike Barton, Utility Supervisor at PowerSouth Energy Cooperative, Lowman Power Plant.

Source: World Coal Asia

SUBSCRIBE TO OUR NEWSLETTER

Newsletter signup

Follow us

E‑Crane Worldwide

Koekoeklaan 53
9991 Adegem
Belgium

Contact us

T +32 9 378 04 44

info@e-crane.com

Bureau of International Recycling
The Institute of Scrap Recycling Industries, Inc. (ISRI)