Cargill Schelde-Natie
Description of the E-Crane
Schelde-Natie realized a new offloading project in the port of Antwerp in cooperation with Cargill. The goal is to discharge 575,000 tons of oilseeds per year.
In order to achieve this goal, Schelde-Natie replaced an existing grain elevator with an Equilibrium crane to offload vessels and a “bulk-flow” system to discharge rail cars. After careful study of the options and excellent references for the E-Crane®, Schelde-Natie contacted E-Crane®. Another plus for E-Crane® is the fact that two E-Cranes are operating successfully since September 2000 at...