The Challenge:
Modernizing Oilseed Unloading for 575,000 Tons per Year
Schelde-Natie needed to modernize its existing unloading infrastructure to support an ambitious annual target of 575,000 tons of oilseeds. The existing grain elevator had to be replaced with a solution capable of efficiently unloading vessels while integrating into a broader bulk handling operation that also included railcar discharge. Energy consumption, maintenance costs, equipment lifetime, and noise were important considerations in the selection process. After carefully studying the available options and reviewing existing E-Crane references, Schelde-Natie selected the equilibrium crane concept for the project.
“Our main reason for implementing the E-Crane®, is the enourmous savings on energy and maintenance costs. Also the life span is a large plus in comparison with the competitors. Moreover the E-Crane® generates far less noise than the previous setup.”
Mr. van Raemdonck
The Solution:
Energy-Efficient Vessel Unloading at the Port of Antwerp
E-Crane worked with Schelde-Natie to implement a vessel unloading solution focused on efficient operation, long-term reliability, and lower operating costs. The project progressed smoothly from pre-study through engineering and implementation, integrating the E-Crane into the new bulk handling setup.
The solution includes:
BUSINESS OUTCOME